$1.6T+
DOCUMENTED OPERATIONAL LOSS. ANNUALLY.
TAP TO ENTER
NOMOS
CONFIDENTIAL · INVESTOR MATERIALS
NOMOS INDUSTRIES INC. · 2026
NOMOS
no · MOS | GREEK · νόµος · n.
THE OPERATING SYSTEM FOR THE BUILT WORLD.
Order. We synchronize material, labor, and intent to eliminate the void.
ᴏᴜsɪᴀ • ʜʏʟᴇ • ʟᴏɢᴏs   ·   Founded 2026
NOMOS
01 — THE PROBLEM
THE OPERATIONAL VOID
~$13–14T
Global construction market today
$17.5T projected by 2030
SOURCE
5–15%
Project cost lost to rework alone
Excludes procurement drag, idle labor, coordination failure
SOURCE
$1.6T–$1.85T
Documented productivity + poor-data losses
McKinsey productivity gap + Autodesk/FMI poor-data study
SOURCE ① SOURCE ②
0
Field-first autonomous operating systems
Positioning — not a sourced statistic
"Construction is the world's largest industry. It is also the world's least digitized."
— McKINSEY GLOBAL INSTITUTE
NOMOS
02 — FOUNDER STORY
WE KNOW
THE MUD.
Built-world DNA. Second-generation tradesperson family. Raised inside the operational void — watched it kill margins, break timelines, and grind good builders into the ground.

NOMOS wasn't conceived in a boardroom. It was conceived on the job site. That's the only place this problem makes sense from.
THE FOUNDER'S LAW
The problem is personal.
We aren't disrupting an industry. We are ending generational waste.
The solution is field-first.
Built for gloved hands, sunlit screens, and 3:30 AM decisions.
The exit is the mission.
DOD. Procore acquisition. Global infrastructure standard.
NOMOS
03 — THE SOLUTION
NOT AN APP.
AN OPERATING SYSTEM.
THEY WATCH
Document
Procore, Autodesk, OpenSpace: digital filing cabinets and photo archives. They document the chaos after it happens.
NOMOS ENFORCES
Orchestrate
Autonomous material tracking, real-time fiscal burn, ripple-sync dependency orchestration. The site heals itself.
THE RESULT
Order
35% waste eliminated. Margins doubled. Every contractor, foreman, and electrician operating from a single source of truth.
NOMOS
04 — THE TECHNOLOGY
FIVE PILLARS.
ONE STANDARD.
01
HYLE
THE EYES
AI Depletion Vector. Predicts material zero-point before the foreman notices the pile is low.
02
MODUS
THE HEARTBEAT
Real-Time Financial Burn. Hourly profit pulse. Stops the bleed before the bank account does.
03
TENET
THE NERVOUS SYSTEM
Ripple Sync. One delay ripples through the site. TENET re-routes every crew autonomously.
04
MATERIA
THE MEMORY
Immutable Ledger. Cryptographic proof of every material: insurance, audit, legal, DOD-grade.
05
VECTIS
THE LEVER
Auto-Order Trigger. When depletion and budget align, VECTIS acts. Full autonomous, approval, or alert mode — human supervised by choice, autonomous by default.
PATENT PENDING · US PROVISIONAL APPLICATIONS FILED APRIL 2026 · 3 APPLICATIONS · 32 CLAIMS · 10 INDEPENDENT CLAIMS · FILING IN PROGRESS
NOMOS
05 — PRODUCT FLOW
STUPID SIMPLE.
DEFENSE GRADE.
01
SCAN
Worker points phone at delivery. QUICK CAPTURE identifies material, reads ticket, verifies spec. One tap.
02
LOG
MATERIA Ledger records asset identity, GPS, timestamp. Tamper-proof. Insurance-admissible. Instant.
03
TRACK
HYLE watches the pile. MODUS watches the money. Both update in real-time as the crew installs.
04
SYNC
TENET monitors all dependencies. Delay detected. Crews re-routed automatically before a minute is wasted.
05
ORDER
VECTIS sees depletion coming and budget is healthy. Purchase order drafted, approved, or executed — GC sets the mode. Truck dispatched. Zero scrambling.
NOMOS
06 — MARKET
THE BUILT WORLD
IS A $17.5T OCEAN.
TAM
~$13–14T
Today · 4.9% CAGR
$17.5T projected by 2030
SOURCE
SAM
$892B
16.3% CAGR
ConTech addressable layer
INTERNAL MODEL
SOM
$4.7B
Year 1–3
Phase 1 GC target
INTERNAL MODEL
2026 TAILWINDS: LABOR SHORTAGE · MATERIAL VOLATILITY · INFRASTRUCTURE SPEND · DOD MODERNIZATION · INDUSTRY DIGITIZATION PRESSURE
NOMOS
07 — COMPETITIVE POSITION
THEY WATCH THE CHAOS.
WE ENFORCE THE ORDER.
Procore Autodesk OpenSpace Buildots NOMOS
Field-first design××××
Autonomous procurement××××
Real-time fiscal burn××××
Immutable asset ledger××××
AI vision intake××
Ripple dependency sync××××
Offline-first mobile×××
NOMOS is the only solution that closes the full loop from field intake to autonomous procurement.
NOMOS
08 — BUSINESS MODEL
SOLD TO THE GC.
POWERED BY THE FIELD.
The General Contractor is the buyer. NOMOS becomes a job site requirement, like hard hats. Subcontractors comply because it gets them paid faster. Workers adopt it because it respects their time.
FOUNDATION
$49/mo
Crews of 10 or less
HYLE, MATERIA, QUICK CAPTURE. Rate locked for 2 years. For the small business owner who built America and never had a system working for them. Until now.
SITE LICENSE
$2,500/mo
Per active site
Unlimited users. Full five-pillar stack. GC dashboard.
ENTERPRISE
$18,000/mo
Per GC organization
Multi-site dashboard. API integration. Dedicated onboarding.
DOD / GOV
Custom
Licensed infrastructure
Immutable ledger + audit export. MATERIA-grade compliance pack.
PROC. REVENUE
0.4%
Of auto-ordered materials
VECTIS execution fee. Zero marginal cost. Scales with volume.
GC pays. Field workers comply. Small crews grow into site licenses. Network effect is structural.
NOMOS
09 — ROADMAP
THREE PHASES.
ONE STANDARD.
PHASE 01
THE
BEDROCK
2026 · Year 1
  • HYLE · Asset Depletion Engine
  • MODUS · Financial Burn
  • MATERIA · Immutable Ledger
  • QUICK CAPTURE · AI Vision Intake
  • GC Site License · 50 pilot sites
  • Foundation Tier · Crews of 10 or less
PHASE 02
THE
NERVOUS SYSTEM
Year 2
  • TENET · Ripple Sync live
  • VECTIS · Auto-Procurement
  • LOGOS · Blueprint Conflict AI
  • VALENCE · Crew Dependency Mgmt
  • CURA · Safety & Compliance AI
PHASE 03
THE
STANDARD
Year 3–5
  • DOD / Federal contracts
  • Procore / Autodesk acquisition target
  • BIM integration · NOMOS-as-spine
  • IoT / RFID sensor layer
  • Global infrastructure licensing
NOMOS
10 — THE ASK
WE ARE PLANTING
A SEED ROUND.
IP FILED. 2 of 3 provisional patents filed. Third filing in progress.
BRAND ESTABLISHED. Identity standard locked.
SITE LIVE. nomos.build
MVP IN BUILD. HYLE · Phase 1. Target: Q2 2026.
RAISING to scale to 50 live pilot sites.
TARGETING
Seed-stage infrastructure funds
DOD Innovation Unit
Construction Infrastructure Funds
Round size and allocation structured at term, sized to the build, not the ask.
PILOT
ROLLOUT
50 GC pilot sites · onboarding · field testing
IP
& LEGAL
Patent prosecution · NDAs · entity formation
SCALE
ENGINEERING
Post-MVP scaling · additional pillars · integrations
OPS
OPERATIONS
Team · infrastructure · 18-month runway
NOMOS
NOMOS INDUSTRIES INC. · 2026
ORDER
IS NOT
OPTIONAL.
νόµος
no · MOS | GREEK · n.
Order. The operating system for the built world.
We synchronize material, labor, and intent to eliminate the void.
Kassandra Nolan · Founder & CEO · NOMOS INDUSTRIES INC.
nomos.build@gmail.com · nomos.build · 2026
ᴏᴜsɪᴀ  ·  essence  ·  the intelligence that knows
ʜʏʟᴇ  ·  matter  ·  the material it tracks
ʟᴏɢᴏs  ·  order  ·  the reason it enforces
NOMOS
APPENDIX — SOURCES · MARKET + SYSTEM FAILURE
01 · Market Scale
Oxford Economics — Industry Key Themes 2026
Used for: construction market growth trajectory. Industry will grow if you know where to look — demand continues despite macro pressure.
SOURCE →
McKinsey — US Manufacturing Renaissance
Used for: infrastructure investment momentum and demand framing. Supports construction market scale and modernization pressure thesis.
SOURCE →
World Bank — Global GDP Data
Used for: construction as ~13% of world economic activity. GDP scale framing.
SOURCE →
02 · Inefficiency + Loss
McKinsey / Designing Buildings — Reinventing Construction
Used for: ~$1.6T construction productivity gap. Industry-wide labor and process inefficiency.
SOURCE →
Autodesk + FMI — Construction Disconnected Report
Used for: ~$1.85T loss tied to poor data, rework, and technology underuse across the industry.
SOURCE →
KPMG — Global Construction Survey 2026
Cost overruns and schedule delays are industry standard, not outliers. Systemic execution failure at scale.
SOURCE →
03 · Rework + Waste
Construction Industry Institute — Rework Study
Used for: 5–15% of total project cost lost to rework alone. Does not include procurement drag, idle labor, or coordination failure.
SOURCE →
Autodesk — Construction Disconnected / FMI Report
Material waste and rework driven by coordination failures and data gaps. Time and cost of rework, and the role of technology in mitigation.
SOURCE →
Patent Status — NOMOS Systems Inc.
2 US provisional applications filed April 29, 2026. Third application filing in progress — May 2026. 32 total claims · 10 independent claims across 3 applications. Inventor: Kassandra Nolan. Micro-entity status. Available in full under NDA for qualified investors.
NOMOS does not compete with documentation tools. NOMOS targets the operational failure layer beneath material, labor, procurement, and decision flow. This is not a labor problem. It is not a supply problem. It is an operational intelligence failure — and it is multi-trillion in scale.